Tuesday, June 16, 2009

BLONDER BID DOCUMENT

OPTION 2: DESIGN, ENGINEERING AND INSTALLATION SERVICES



TOTAL BID FOR DESIGN SERVICES:
TOTAl BID FOR ENGINEERING SERVICES:
TOTAL BID FOR INSTALLAnoN SERVICES
LUMP SUM BID FOR OPTION 2:


$ __ INC. _
$ __ INC. _
$ _INC. _
$_INC _



We herewith enclose our cash, money order, a certified or cashier's good faith check or a bond
with corporate surety in the amount of $ __ $11,952.00 being at least ten percent of
the bid proposed.
Date _4101/09 _



Authorized Signature cf~ H~


Trtle: Director Systems Engineering

No comments: