OPTION 2: DESIGN, ENGINEERING AND INSTALLATION SERVICES
TOTAL BID FOR DESIGN SERVICES:
TOTAl BID FOR ENGINEERING SERVICES:
TOTAL BID FOR INSTALLAnoN SERVICES
LUMP SUM BID FOR OPTION 2:
$ __ INC. _
$ __ INC. _
$ _INC. _
$_INC _
We herewith enclose our cash, money order, a certified or cashier's good faith check or a bond
with corporate surety in the amount of $ __ $11,952.00 being at least ten percent of
the bid proposed.
Date _4101/09 _
Authorized Signature cf~ H~
Trtle: Director Systems Engineering
Tuesday, June 16, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment